PlumbRevise
Inspection & TestingLesson Premium

Continuity: ring readings and parallel paths

Interpret low-resistance measurements without mistaking an alternative path for a sound conductor.

Continuity testing must establish the intended conductor path. A low reading through connected metalwork can hide a broken circuit protective conductor (CPC). Plan the dead test so you understand the paths being measured; do not disconnect protective conductors from an energised installation to chase a reading.

Read the full Inspection & Testing note with Premium

You’re reading the free preview. PlumbRevise Premium unlocks the complete write-up, the worked detail for every Inspection & Testing note — plus timed tests on every module.

Plenty of modules are free to read in full.

Something wrong, unclear or out of date? Report an issue with this note.